Siemens Gamesa remained on top of offshore wind turbine installation in 2022! With 262 turbines installed during 2022 Siemens Gamesa secured another year as the OEM with most turbines installed ahead of Vestas.

Last year 464 offshore wind turbines were installed from four different OEMs and seven different turbine platforms. Siemens Gamesa remained the market leader with the installation of both their 8 MW and new 11 MW turbines. Vestas came in second with 112 turbines installed across four different countries.

WTG Installation by OEM 2022

WTG Installation by OEM 2022
WTG Installation by OEM 2022
Siemens Gamesa Vestas MingYang GE Renewable Energy
SG 8.0-167 DD 173
SG 11.0-193 DD 89
GE H150-6 80
V164-10.0 65
V117-4.2 33
V174-9.5 14
MySE3.0-135 10

Turbine Installation Comeback & Newcomer

GE Renewable Energy returned to offshore wind after a four-year installation hiatus with the installation of 80 turbines of their H150-6 MW. We will keep a close eye on the installation of their next-gen turbine at Vineyard Wind and Dogger Bank A this year.

Finally, Mingyang Smart Energy marked the first offshore installation of a Chinese OEM turbine outside the domestic market with 10 turbines installed at Taranto in Italy.

The 464 turbines installed mark a 7% decrease from the number of turbines installed in 2021.

You can read more about turbine installation durations right here

Stay tuned on LinkedIn for the upcoming H1-2023 series. We welcome your requests and suggestions for our next post in the comments below!

Note: The graph shows turbines installed, not the number of commissioned turbines. Further, the graph excludes turbines installed in China.

© BERNARD BIGER – CHANTIERS DE L’ATLANTIQUE – Vole Au Vent installing GE H150-6 at Saint-Nazaire