2022 saw plenty of foundation installation activity across the offshore wind industry. Heerema Marine Contractors installed the most components with a combined 255 foundation components installed between their vessels Aegir, Sleipnir and Balder. DEME Group was the second most active with 218 foundation components installed between four vessels.

Keep in mind that the duration of installing a transition piece, a jacket or a gravity-based foundation often takes significantly less time than e.g., a set of pin-piles or a monopile.

Foundation Installation by Vessel Company 2022

Foundation Installation by Vessel Company 2022
Foundation Installation by Vessel Company 2022
Monopile Pin-Pile (Sets) Gravity-Based Jacket Suction Bucket TP/Secondary Steel Jacket
Heerema Marine Contractors 71 71 113
DEME 135 83
Seaway 7 122 32 7 24
Saipem 32 85
Jumbo 114
Boskalis 11 54
Van Oord 1 39 5

Innovation Takes the Crown

DEME Group‘s Innovation was the most active vessel with over 150 components installed across Saint-Nazaire, Dogger Bank A, Kaskasi II and Hollandse Kust Noord (108 MPs, 45 TPs).

Note: The chart displays the vessel company operating the vessel that installed the component. The EPCI contract for the installation may belong to another vessel company subcontracting the installation vessel.